Creating and displaying shifts, directly within the Skedulo web app, allows schedulers to make better-informed choices while allocating jobs. Shifts are displayed in the scheduling swimlanes, providing the scheduler with a visual reference while allocating jobs, alerting them to conflicts with the unavailability of a resource.
The shifts console enables the scheduler to comfortably prepare shifts ahead of time, using the inbuilt calendar and optional unavailability overlay. Once the preparation is completed, the shifts can be activated individually, or all in one go if preferred.
Note
The admin settings for shifts need to be enabled to access the shifts console. Contact your Skedulo Customer Success Manager if you require more details on activating "Shifts."
Note
The Skedulo Web App – Shifts (4 min 28)
Access to the shifts console is provided via the navigation menus.
There are two options to create a shift using the Skedulo web app:
Use the "Create Shift" button (at the top-right of the shifts calendar) to launch the "Create Shift" model.
Choose a resource and date then right-click in the blank space in the shifts calendar. An option to "Create shift" will become available. The resource will already be allocated using this method therefore only the shift details are required for the shift to be completed.
Using the first method above, perform the following steps:
Click the "Create Shift" button.
Select the "Details" tab on the modal.
Enter all required shift details. Note, the "tags" field will only be available if the "Shift Tags" feature has been enabled for the organization.
Click on the "Resources" tab.
Select all resources that are to be allocated to the new shift (filters are available to identify specific groups or individuals).
Check the allocations are correct, adjust if necessary.
Click "Create."
Once created, draft shift cards (in the calendar) are displayed with a dashed dark-gray border. This must then be "Published" before the resource(s) can see it.
A scheduler has a few options when assigning shifts using Skedulo:
Assign a resource when the shift is being created.
Assign a resource by editing an existing shift.
Drag an allocated shift card from one calendar swimlane to another, i.e., change the resource. Note, this method returns the shift card to its draft state. It requires publishing before the new resource will see it.
Also, see
Shift tags provide the scheduler a way to filter their resources, matching those who have specific skills (or credentials) to a shift.
The shift tags themselves can be added when creating or updating a shift. Resources that match the applied tags are shown in the "Resources" tab of both the "Create" and "Edit Shift" models. A red exception icon appears when the assigned resource does not match the tagged requirements for the shift.
Shift conflicts can be seen when viewing shifts in the "week" view. If there is a conflict between a shift and a resource's availability or skills (tags), a small exception icon will display in the top-right corner of the shift card.
These icons highlight:
Any shift that is scheduled outside the availability of a resource (or overlaps with another shift).
Any resource that lacks the shift requirements (displayed when the "shift tags" feature is enabled).
To edit a shift, perform one of the following:
-
Right-click on a shift card (draft or published).
Select "Edit" from the drop-down options to open the "Edit Shift" modal.
In the edit modal, edit the existing values, e.g., change the date or add a new resource.
Click "Save."
-
Click on a shift card (draft or published).
From the summary of the shift's details, click on the text link named "Edit" to open the "Edit Shift" modal.
In the edit modal, edit the existing values, e.g., change the date or add a new resource.
Click "Save."
-
Click on a shift card (draft or published).
At the top-right of the shift's details is an additional menu. Click edit to open the "Edit Shift" modal.
Edit the existing values, e.g., change the date or add a new resource.
Click "Save."
Note
When a shift card is edited and saved, only that single card is changed. If two or more resources share the same shift, e.g., "Morning Shift," the same edit must be made to each resource's shift card (if that is the intention) –a single edit will not change all instances of the shift.
When adding additional resources using "Edit," all new instances of the shift card will appear in draft format first, i.e., they need to be published before the resource(s) will see the shift in their mobile app.
Unique to the Skedulo web app, shifts go into a draft state when they are first created. This draft state enables the scheduler to make final adjustments before they are activated. In their draft state, shifts are not visible on the scheduling swimlanes nor in the Skedulo mobile app.
Schedulers have two options when publishing drafts, they can do so individually, or all at the same time.
To publish a single shift, either right-click (and select "Publish" from the menu options) or left-click on the draft shift card in the shifts calendar. A left-click pops-up the shift's details (its title, start and end time and dates). At the top-right of this pop-up is an additional menu with three options: "Publish," "Edit," or "Delete." Click publish to activate the shift. Once published the shift card in the calendar is displayed using a solid dark color.
A scheduler needs only to click on the highlighted "Publish x Shifts" button, located at the top-right of the shifts calendar, to publish all draft shifts at the same time. Once published, the shift cards in the calendar are displayed using a solid dark color.
It is possible to copy shifts (published or draft) to other dates in the calendar. Open the "Copy shifts" modal using the "Copy shifts" button, which appears in the drop-down menu located at the top-right of the shifts calendar (the three dots icon next to the "Publish" button).
The "Copy Shifts" modal has a few options to configure before clicking the "Copy Shifts" button:
-
Select Region: Only shifts that belong to this region are copied (defaults to the region set in the filter bar of the shifts calendar).
Location (optional): Copy the shifts from a specific location instead of the whole region. Location as defined in "Creating Shifts."
Select Period: Using the drop-down menu select days or weeks—this isolates the period used to identify the shifts to be copied (which are highlighted in the calendar). The initial value is the same as the period shown in the shifts calendar.
Select Calendar Date ("Copy from" and "Copy to.") The left-hand calendar (copy from) indicates the days that shifts will be copied from (if any exist). The right-hand calendar (copy to) indicates where the shift(s) will be copied, i.e., Their destination—dates start one week after the selected date in the left-hand calendar. Note: Confirmation of the actual dates to be copied are listed beneath the calendars.
-
Checkbox options:
Ignore resource allocations - all copied shifts will be unassigned (OFF by default): Check this option to ignore previous resource allocations. All copied shifts will then appear in the "Unallocated Shifts" swimlane.
Include unpublished shifts (ON by default): Check this option to copy both published and unpublished shifts for the period defined.
Note
It is possible to select a consecutive date range (to copy) anywhere between one day up to fourteen weeks.
All copied shifts will appear on the target date(s) in a "Draft" state (i.e., unpublished), this is to give schedulers full control over the process. Once published, resources can then be notified.
Where applied, shift tags will also be copied.
Using "Duplicate" gives schedulers the ability to instantly create multiple copies of the same shift, reducing the time it takes to create a roster.
There are two ways to duplicate shifts: via the options menu within the shift information pop-up, or via the right-click menu on a shift card. Clicking on "Duplicate" (via either option) will open the "Duplicate Shift" modal, here the scheduler can set the quantity required.
If a resource has already been assigned, a checkbox appears "Ignore resource: duplicated shifts will become unallocated." This checkbox controls whether the duplicated shifts include the same allocated resource—if not they are moved to the "Unallocated Shifts" swimlane.
When the scheduler clicks the "Duplicate" button, additional shifts are created with the same date/time and name. Once performed, the scheduler can move the duplicated shifts to other swimlanes or dates.
Note
The duplicate option is available for all shifts, whether they are published or draft (allocated or unallocated).
To view the shifts that have been created there are three options:
Use the Skedulo web app shifts console.
Use the Skedulo web app scheduling console.
Use Salesforce (via the "App Launcher" and "Shifts").
The shifts console provides schedulers with a view of both draft and published shifts per resource, per region. They can also overlay their resources' availability by selecting the "Show unavailability" checkbox, at the top-right of the shifts calendar.
View a summary of a shift's details by clicking the shift card. The following are available in the pop-up:
The shift's title (optional).
Start and end times.
Shift state (if in "Draft").
The allocated resource details (when "Published").
An "Edit" link (when clicked will open the shift in the "Edit Shift" modal).
An extra options menu (which provides to "Edit," Publish," and "Delete").
The view selector allows the scheduler to choose from the available options to increase or decrease the visible time span, i.e., view a day, a week, or two weeks of shifts. The default view is "week."
Tip
Shifts that go past midnight have a crescent moon symbol at the top-right corner of the shift card.
Note
Resources will only appear when looking at (filtering) their primary region in the shifts calendar, i.e., they will not appear in any secondary regions.
Refer to
Schedulers can filter their resource list to find the most suitable resources. The following filter options are available specifically for shifts:
Region.
Location.
Resource Type.
Resource Category.
Resource Tags.
To remove an allocated resource from a shift card (effectively canceling the shift for that resource), perform one of the following:
Drag the shift card to the "Unallocated Shifts" swimlane in the shifts calendar. The shift card will be reset back to its draft state.
Click on the shift card, and from the "more options" menu select "Edit." Click on the "Resources" tab and deselect the checkbox next to the resource's name. Finally, click "Save." The shift card will be reset back to its draft state, and it will be placed in the "Unallocated Shifts" swimlane.
Once back in a draft state, the shift can be reused (reinstated or repurposed) as required.
To delete a single shift, right-click on the shift card in the shifts calendar. A menu will be displayed with four options: "Edit," "Publish," "Delete," and "Duplicate." Click delete to remove the shift. Once deleted, the shift card is removed from the shifts calendar, console swimlanes, and from any affected resources' mobile agenda.
When a resource is made inactive in the CRM (i.e., "Is Active" is unchecked in the resource's profile), all future shift allocations for that resource are removed and set to "Unallocated" (Draft). The scheduler can then clearly see which shifts require rescheduling.
In the following example, Dexter is deactivated by unchecking the flag "Is Active" on his resource profile. Doing so removes him and his allocated shifts from the shifts calendar. The two shifts that were scheduled for future dates have been moved to the "Unallocated" row of the shifts calendar and are set as "Draft."