"Deallocate" will remove allocated resources from the selected job(s). If a date and time have been scheduled for that selected job(s), they will remain untouched.
"Unschedule" will remove allocated resources and any scheduled date/time. An unscheduled job will have its job status reset to "Queued."
Table 6. A comparison of the two features: Deallocate and Unschedule.
Deallocate |
Unschedule |
|
---|---|---|
Removes allocated resources. |
Yes |
Yes |
Removes scheduled date and time. |
No |
Yes |
The deallocate and unschedule features are available from:
The horizontal swimlane, vertical swimlane and map views of the scheduling console.
Job details view (see toolbar above the allocated resources panel).
On the job details view, the "Deallocate" feature is called "Remove Allocations." Clicking on the remove allocations button removes all resources that have been allocated to the job. The date and time remain set.
Tip
To remove a single resource from a job, click on the "Remove Resource" button on the resource card.
On the job details view, click on the "Unschedule" button to remove all resources that have been scheduled for the job. The date and time will also be removed.
Note
The job marker (or map pin) displayed in the map view will also be removed during the unschedule process.
Deallocate, and unschedule will be enabled for jobs with following job statuses (see table).
Table 7. Deallocate and unschedule feature enabled (Yes/No) per job status.
Job Status |
Deallocate |
Unschedule |
---|---|---|
Queued (no Allocated Resources). |
No |
No |
Queued (with Allocated Resources). |
Yes |
No |
Pending Allocation. |
No |
Yes |
Pending Dispatch. |
Yes |
Yes |
Dispatched. |
Yes |
Yes |
Ready. |
Yes |
Yes |
En Route. |
Yes |
Yes |
On Site. |
No |
No |
In Progress. |
No |
No |
Complete. |
No |
No |
Cancelled. |
No |
No |
A scheduler can use deallocate or unschedule on several jobs at the same time. In scheduling console, select all jobs that the feature should be applied to and click on deallocate/unschedule icon. Once deallocation or unscheduling is complete, a notification will be displayed on-screen.
If deallocate/unschedule cannot be applied to one of the selected jobs (e.g., a job with status="Complete"), the job will be skipped during processing.
Comments
0 comments
Article is closed for comments.