To be able to leverage the available Skedulo + KeyPay functions, the integration settings need to be customized to align with the rules applicable to your operations.
Within "Setup > Custom Settings":
The following are the only settings that can be configured for an environment. The rest will be a one-off set up performed by Skedulo.
Table 12. Sked KeyPay integration settings.
Setting |
Description |
---|---|
JA Status for Start Time. |
Job allocation status defines the shift's actual start time (En Route/On Site/In Progress). |
Minimum Shift Length. |
The minimum length of the shift. |
Enable Leave Sync. |
Enable/disable leave sync from Skedulo to KeyPay. |
Job Gap Threshold. |
Controls the tolerable gap between a previous shift's end time and a new job's start time—which can see a resource still being considered for allocation with the previous shift being extended. |
Create Travel Activity When JA Completed. |
If set to true, a new travel activity will be created, when JA is completed. End Time = JA Time In Progress and Start Time = JA Time In Progress - Estimated Travel Time. |
Additional values can be defined in the Custom setting “Skedulo Configs”:
Table 13. Skedulo Configs.
Custom Setting |
Description |
---|---|
KP_JA_Summed_Travel_Km_Fields. |
Fields summed on the Job Allocation record to KM Traveled on Shift. Possible values:
|
KP_Shift_Enabled_Activity_Types. |
Activity types to create shift records. Using ',' as delimiter for defining multiple activity types. |
KP_Km_Travel_Work_Type_Id. |
KeyPay worktype id for sending unit of KM travel when exporting timesheet. |
KP_Enable_Shift_First_JA_Travel. |
Control whether KM Travel of the first JA of a shift will be included in Shift Travel KM calculation. |
Allow_Get_Costing. |
Controls whether the costing functionality is displayed within allocation screens. |
RM Allow Create Shift. |
Set value to "true." |
Show Required Resources. |
Set value to "true." |
Show Resource Allocation. |
Set value to "true." |
Timesheet Enable Payroll Submission. |
Set value to "true." |
Timesheet Enable Shift. |
Set value to "true." |
Timesheet Roster Period. |
Define the number of days within the business payroll period, i.e., 7 for a week period, or 14 for a fortnight. |
Timesheet Roster Start Date. |
Start date of the first roster period commenced within Skedulo. |
Timesheet Roster Type. |
Either define value as "week" or "fortnight." |